|
|
|
HOME- TECHNOLOGY- CONTACT-
|
|
|
Detail Costs per mile and kilometer.
Metric
| Power Demand |
4,000 |
|
watts |
Energy Pack JPods or Cargo Pods |
|
|
|
|
Includes air condition, heat and accessory power |
|
550 |
|
kg |
Payload capacity of up to 4 people or 550 kg pallet of cargo |
| Speed |
39 |
|
km/hr |
Acceptable rate of non-stop urban travel |
| Time |
0.026 |
|
hours/km |
Time to travel a km (1.6 minutes) |
| Consumption |
104 |
|
W-hr/km |
Power demand, equals 4000 x 0.026 |
| Neutral |
15,385 |
|
JPods/day |
Energy neutral traffic capacity per km of collection |
|
|
|
|
|
| Collectors |
2 |
|
m |
Width of collectors |
|
160 |
|
watts/m^2 |
Noon collection capacity |
| Time |
5 |
|
hours |
Typical effective hours of noon solar collection in a day |
| Energy Available |
1,600,000 |
|
W-hr/day/km |
Energy collected per km of JPods rail |
|
|
|
|
|
| Capital & Interest |
$ 1,699 |
|
$/day/km |
Cost to build, operate and maintain per day per km |
|
$ 0.11 |
|
$/JPod/km |
Capital and Interest Cost per JPod per km |
|
|
|
|
|
| Energy costs |
$0.07 |
|
kW-hour |
Typical cost of electricity |
|
$0.008 |
|
$/JPod/km |
|
|
|
|
|
|
| Total |
$ 0.12 |
|
|
Energy neural system cost to move loaded JPods per km |
|
550 |
|
|
Max Payload |
|
$ 0.00021 |
|
$/kg/km |
Cost to move a kg energy neutral a km |
Imperial
| Power Demand |
4,000 |
|
watts |
Energy Pack JPods or Cargo Pods |
|
|
|
|
Includes air condition, heat and accessory power |
|
1,200 |
|
lb |
Payload capacity of up to 4 people or 550 kg pallet of cargo |
| Speed |
24 |
|
mph |
Acceptable rate of non-stop urban travel |
| Time |
0.042 |
|
hours |
Time to travel a mile (2.4 minutes) |
| Consumption |
167 |
|
W-hr/mile |
equals 4,000 W x 0.04 hr |
| Neutral |
15,206 |
|
JPods/day |
Energy neutral capacity |
|
|
|
|
|
| Collectors |
6 |
|
feet |
Width of 16 watts per square foot collectors |
|
16 |
|
watts/ft^2 |
Noon collection capacity |
| Time |
5 |
|
hours |
Typical effective hours of noon solar collection in a day |
| Energy Available |
2,534,400 |
|
W-hr/day/mile |
Energy collected per mile of JPods rail |
|
|
|
|
|
| Capital & Interest |
$ 2,740 |
|
$/day/mile |
Cost to build, operate and maintain per day per mile |
|
$ 0.17 |
|
$/JPod/mile |
Capital and Interest Cost per JPod per mile |
|
|
|
|
|
| Energy costs |
$0.07 |
|
kW-hour |
Typical cost of electricity |
|
$0.012 |
|
$/JPod/mile |
|
|
|
|
|
| Total |
$ 0.18 |
|
|
Energy neural cost to move loaded JPods per mile |
|
1,200 |
|
|
Max Payload |
|
$ 0.00015 |
|
$/lb/mile |
Cost to move a pound, energy neutral |
|
|