Immediate Need is for 3 Kitty Hawk Networks
- Concept
- Iraq, funded $75 million network
- GREENPORT and Atoka
- Secondary; $47 billion in networks are are staged.
Government Agreements summarized at Key Steps
JPods approach to issuing contracts:
- We want excellent vendors and will choose based on capabilities matching our needs.
- We are opening a new and very large market. Suppliers willing to contribute to opening the market by investing in their own participation is greatly appreciated.
- We have three ways of suppliers to benefit:
- Contracts
- “We win, you win” alliance where JPods commits to buying 25x the level of efforts supplied.
- PathFinder framework where equity in JPods networks is given to those helping to open Rights of Way access.
Components Required:
- Vehicles (JPods):
- Pod with car
- Chassis Summary
- Chassis Draft Requirements
- Drive systems (Bogies):
- Bogie with 200mm Wheels (Fusion 360)
- Bogie images, what we have built before
- Switch Behaviors, the Boss on top of the bogie that rides against a switch built into the guideway.
- Bogies and guideway interface, the envelop in which the bogies must travel and switch.
- Bogie Summary
- Draft Concept and Spec: Bogie
- Guideways (Truss and other structures)
- Truss images
- Draft Concept and Spec: Truss
- McLaren Truss pdf
- Milos Truss for mobile units
- Power
- Draft Spec
- Stations:
- Draft Spec
- Modeling and Education
- STEM
- Route-Time
- JPods3D
- Camera
- HuskyCam (video)
|